Work on the roof

On the 26th September the glulam beams arrive so that work can begin on the roof.  The quarter ton, eleven metre beam was manhandled into place by Stuart and his men.

IMG-20130926-00065IMG-20130926-00070                                                     That’s the first one in place only another ten to go!

The hand cut roof takes shape, a veritable forest of wood.

IMG_0948

 

IMG_0930IMG_0951

 

 

 

 

 

 

 

When complete, sterling board is nailed on to add strength to the structure.


IMG_0945
IMG_0934